Arrange shipping single dry container 20 feet or 40 feet from Guangzhou to Singapore must order container space in advance of 3 days, at least 2 days before pick up container from port, SO is the container craning executive sheet, container heap check the SO sheet with right information and then surrender container to haulage trucker, once picked up container from heap, driver should trucking container to right address to fulfill cargo loading works, but all these work must have done after confirm container shipping cost done. 

Our freight cost of shipping 20 feet container and 40 feet container has different rate, mainly rely on what shipping terms CIF customer pay China export port local surcharge and sea freight, FOB pay only sea freight, DDU / DDP pay full rate since shipper’s address to consignee in Singapore address.